I am a potential site owner. What are the technical requirements?
Each charger draws up to 80A at 400V three-phase. Suitable car parks will be located close to a distribution transformer with enough spare capacity to support a 55kVA load. There must also be enough space behind the park to accommodate a 750mm wide by 300mm deep footprint. Please contact us to evaluate site suitability.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed